Dongou Industry Zone, Oubei, Yongjia, Wenzhou, Zhejiang, China +86 577 5798 8886 contact@datianmachine.com
I am extremely delighted that we successfully installed another Vapor Recovery Equipment for stage III at Sinopec yesterday.

My installation team initiated the installation in the afternoon and completed the debugging by 8:00 p.m.

Owing to my preoccupation with other matters, I was unable to be present on site. My installation team sent me photos after they accomplished the task. I express my gratitude to my team for their dedicated efforts.

We have installed 10 pcs for Sinopec over the past two months. More devices are slated for installation at Sinopec this month.

I am extremely delighted that we successfully installed another Vapor Recovery Equipment for stage III at Sinopec yesterday. - photo 1

Following our calculations, we can recover 600 to 1,300 liters of oil per month at different gas stations. Simultaneously, we don’t need to maintain the equipment at a temperature of minus 30 degrees Celsius, thereby achieving energy conservation and oil recovery.

In addition, Remote Control System has been achieved. Our technical team will continuously monitor the equipment after installation. This encompasses compressor pressure, vacuum pump pressure, temperature variations, discharge flowrate, and emission concentration data.

and My Name is Green Guard

Email for more info: contact@datianmachine.com

I am extremely delighted that we successfully installed another Vapor Recovery Equipment for stage III at Sinopec yesterday. - photo 2
Keep reading

More from the Blog

Talk to us about your project

Tell us your site layout, tank capacity and throughput target — we will come back with a matched package within 24 hours.

Get a Quote All Blog Posts