Exhibitions, installations, certifications and workshop notes from the Datian team.
Installed and commissioned with our partner Tamkeen Mobility at a coastal fuel station — live HMI shows vent-stack VOCs at 0 g/m³, well below the 2 g/m³ limit.

31 October 2026
Our new high flow fuel dispenser just finished assembly on the shop floor — an open-skid unit built for mining sites, tank farms and tanker loading. Here is a first look, straight from the workshop.
Read more →
26 October 2026
These DT-G dispensers just finished assembly in our Wenzhou factory. Look at the badge on the cabinet in the photo below — that is our own Datian Fueling logo, and it is worth explaining.
Read more →
19 October 2026
Eleven new photos from our assembly floor: cabinet, hydraulics, electronics and packing — no renders.
Read more →
18 October 2026
G Series, T Series at 80 and 120 LPM and high-flow 200-300 LPM units moving down the Datian workshop floor - built with our own CP8 pumps and J6 meters, flow-tested before packing.
Read more →
9 October 2026
Datian builds the pumps, flow meters, solenoid valves and sensors inside fuel dispensers, and was the Chinese partner in Bennett's Shanghai joint venture.
Read more →
9 October 2026
A Red Jacket STP replacement takes one of two shapes: swap the whole DT-STP assembly, or change the motor end only. Here is what decides which applies.
Read more →Send us your requirements and we will match the right dispenser, pump or meter to your site.
Get a Quote All Products