Dongou Industry Zone, Oubei, Yongjia, Wenzhou, Zhejiang, China +86 577 5798 8886 contact@datianmachine.com
Outra tarefa de instalação de equipamento de recuperação de vapores na Sinopec On a day marked by precipitation, yet concurrently enjoyable, an additional Vapor Recovery (VR) Equipment installation was successfully completed at the Sinopec station.

Furthermore, my colleagues kindly forwarded the photograph in my absence today, and I extend my gratitude to all for their exceptional efforts.

Equipe de instalação com capacetes e coletes refletivos junto à base da unidade de recuperação de vapores

This is the second Green Guard vapor recovery unit commissioned at the same site, with the pipework and commissioning photographs in the installation gallery.

Keep reading

Mais do blog

Fale conosco sobre seu projeto

Tell us your site layout, tank capacity and throughput target — we will come back with a matched package within 24 hours.

Get a Quote Todas as publicações do blog