GreenGuard Vapor Recovery Stage III System installed at AlShura Island, Red Sea, Saudi Arabia

We are proud of our partnership with Tamkeen Mobility for the installation of the Green Guard Vapor Recovery Stage III System at AlShura Island, Red Sea, Saudi Arabia.

Engineered and manufactured by Zhejiang Datian Machine Co., Ltd., this system captures fuel vapors during marine refueling operations. It effectively cuts hydrocarbon emissions and lowers environmental impact, delivering cleaner, smarter fueling solutions for the fast-growing marine ecosystem on the Red Sea.

GreenGuard control panel – Vapor Recovery Solution

Green Guard VR technology is built for high performance and sustainability, fully compliant with Saudi VOC regulatory requirements.

Adil Hussain, Tamkeen Mobility field engineer, at the Red Sea site

Credit where it is due: Adil Hussain, field engineer from our partner Tamkeen Mobility, led the on-site installation, configuration and testing of the GreenGuard unit. His careful commissioning work is exactly what makes a vapor recovery system perform the way it was designed to.

GreenGuard vapor recovery unit in service at a coastal fuel station on the Red Sea

The stainless-steel enclosure stands up to the humid, salt-laden coastal air of the Red Sea — built for marine and island fueling environments, not just inland stations.

GreenGuard HMI showing live process data with outlet VOCs at 0 g/m3

The live HMI tells the story in numbers: fuel vapors drawn from the storage tank enter the system at concentrations up to 864 g/m³, while the vent-stack emission stays at 0 g/m³ on the display — well below the 2 g/m³ limit. Nearly every gram of hydrocarbon goes back into the tank instead of into the air.

#VaporRecovery #Stage3 #MarineFueling #Sustainability #CleanTechnology #FuelRetail #SaudiArabia #ZhejiangDatian

The unit installed at AlShura Island is a Green Guard Stage III vapor recovery system. More site photographs from China and overseas are collected in the installation gallery.

Keep reading

More from the Blog

Talk to us about your project

Tell us your site layout, tank capacity and throughput target — we will come back with a matched package within 24 hours.